Jobs List
Jump to navigation
Jump to search
The matilda jobs to do list (so far)
Please feel free to add (but dont expect us to do it all)
- Downstairs gantry/Disabled toilet drip needs sorting
- Put up some shelves in tat room
- Papering stairwells
- Paper hacklab toilet
- Noticeboards for front of building.
- Windows in art studios to look at.
- Door to LTT's space.
- Door and door frame into cafespace (needs door handles)
- Cafe space ceiling panels missing
- Paint 'Toilet' signs on bogs + paint second coat on doors
- Put 2nd handrail on the steps to gig space
- Put peice of wood on bottom of door leading to gig spaces
- Cap water heater inflow in lhs toilet main stairs 1st flr
- Find some shelves for little room next to cafe
Jobs done and dusted
- Toilets *(All Working Now)*
- Repair 1 window in hacklab toilet. *(Done)*
- Sort out lighting for ent and gantry. *(Done)*
- Boards to go on front windows. *(Done)*
- Putty and replace windows in art gallery. *(Done)*
- Notice board for gantry. *(Done)*
- Clear small room between cafe and old free shop *(Done)*
- Tip run - save rubble bags *(Done)*